Project Name,Applicant Organization Name,Applicant State,Lat,Long,Zip Code ,Project Size,Urban/ Rural,Proposed Award,Proposed Project Cost,Proposed 117(d)(2)(a) Amount*,Project Description 
Centennial Corridor State Route 58/99 Freight Improvement Project,City of Bakersfield,CA: California,35.3515611,-119.0576298,93309,Large,Urban,"$50,000,000 ","$386,637,000 ", - ,"The project will construct the SR-58 Connector/Mainline and related components of the The City of Bakersfield will receive $50,000,000 to construct the SR-58 Connector/Mainline and related components of the Centennial Corridor program in Bakersfield. The Centennial Corridor, once completed, will span approximately 11 miles from Cottonwood Road in the East to Heath Road in the West. The INFRA project spans the current gap in the corridor by extending the Westside Parkway to the southeast from its existing terminus at Truxton Avenue to connect with SR-58 and SR-99."
Interstate 5 Golden State Chokepoint Relief Program (I-5 Component),Los Angeles County Metropolitan Transportation Authority,CA: California,34.3677169,-118.4747173,91321,Large,Urban,"$47,000,000 ","$500,347,000 ", - ,"Los Angeles County Metropolitan Transportation Authority will receive $47,000,000 to construct the Interstate 5 Golden State Chokepoint Relief Program project to improve Interstate 5 in Los Angeles County. The project will construct approximately 13.4 centerline miles of HOV lanes, add approximately 2.7 miles of new truck lanes, build auxiliary lanes, widen and replace bridges, and make other improvements."
I-25 South Gap Project,El Paso County,CO: Colorado,39.2942344,-104.8221147,80104,Large,Rural,"$65,000,000 ","$350,000,000 ", - ,"El Paso County will receive $65,000,000 to widen an approximately 18-mile segment of I-25 from Monument to Castle Rock by adding one tolled express lane in each direction. The project will also provide wider shoulders, wildlife crossings, and dynamic lane management and variable speed limit systems. This segment is the only remaining four-lane section of I-25 in the corridor between the Denver and Colorado Springs metro areas. The project will also provide wider shoulders to improve safety and incident management, and will include improved wildlife crossings."
I-70 Westbound Peak Period Shoulder Lane,Colorado Department of Transportation,CO: Colorado,39.7942815,-105.6177942,80452,Large,Rural,"$25,000,000 ","$96,600,000 ", - ,"The Colorado Department of Transportation will receive $25,000,000 to add an approximately 12-mile tolled shoulder lane on Interstate 70 in Clear Creek County. The project includes resurfacing and widening of I-70, in addition to paving and reconstruction of a frontage road, construction of a new bridge, and installation of an approximately 3.5-mile multi-use facility. The project mirrors a recently-installed peak period shoulder lane in the eastbound direction."
SR 400 Express Lanes,Georgia Department of Transportation,GA: Georgia,33.9253024,-84.3857442,30328,Large,Urban,"$184,124,447 ","$1,623,124,447 ", - ,"The project will construct approximately 17 miles of priced two-lane, bidirectional managed lanes along SR-400 from Spalding Drive to McGinnis Ferry Road in Fulton County, and one managed lane in each direction from McGinnis Ferry Road north to McFarland Parkway in Forsyth County."
Accelerating Regional Mobility: I-80/I-380 Systems Interchange,Iowa Department of Transportation,IA: Iowa,41.6985442,-91.685788,52340,Large,Rural,"$50,000,000 ","$416,506,706 ", - ,"edesign of the I-80/I-380 systems interchange. The project will replace the cloverleaf-style interchange with a fully directional, turbine-style interchange and will widen both interstates in the project area, adding additional lanes with full 12-foot shoulders. The project also includes the construction of a new interchange at Forevergreen Road."
"Interstate 84 Safety, Mobility, and Economic Opportunity Expansion - Karcher Interchange to Franklin Boulevard","Transportation, Idaho Department of",ID: Idaho,43.6189362,-116.5346883,83687,Large,Rural,"$90,240,000 ","$150,400,000 ", - ,"The Idaho Department of Transportation will receive $90,240,000 to improve approximately 2.8 miles of I-84 from the Karcher Road Interchange to Franklin Boulevard. The improvements include widening I-84 to three lanes in each direction, adding auxiliary lanes, replacing and widening an overpass and an undersized canal structure, replacing and expanding two bridges over a railroad and canal, ramp improvements, reconstruction of an interchange, and reconstruction of a bridge over I-84."
"75th Street Corridor Improvements and Argo Connections (P3, GS19, B9)",Illinois Department of Transportation,IL: Illinois,41.7547889,-87.8107561,60455,Large,Urban,"$132,034,680 ","$413,466,297 ","$12,249,643 ","The Illinois Department of Transportation will receive $132,034,680 for the completion of three components of the C.R.E.A.T.E program of rail improvements in the Chicago area: (1) the Forest Hill flyover consists of a new north-south flyover structure eliminating conflicts between north-south and east-west train movements at the Forest Hill Junction; (2) the 71st Street Grade Separation will separate the Western Avenue rail corridor from 71st street; and (3) the Argo Connections component will improve connections at the Argo and Canal junction, address the 87th Street chokepoint, and increase capacity at Argo yard."
Boone County I-71/I-75 Interchanges,Executive Office of the Commonwealth,KY: Kentucky,38.8832566,-84.5850997,41094,Large,Urban,"$67,445,000 ","$150,890,000 ", - ,"The Kentucky Transportation Cabinet will be awarded $67,445,000 to replace two interchanges and make associated improvements along I-71/I-75, south of Cincinnati/Northern Kentucky International Airport. The project will replace the existing conventional diamond interchanges at KY 338 (Richmond Road) and KY 536 (Mt. Zion Road) with double crossover diamond interchanges. The project also includes construction of approximately 2 miles of northbound and southbound auxiliary lanes along I/71-I-75 north of the KY 536 interchange. The project will also eliminate two existing at-grade crossings"
LA 23 Belle Chasse Bridge and Tunnel Replacement,Louisiana Department of Transportation and Development,LA: Louisiana,29.3532344,-89.5261707,70041,Large,Urban,"$45,000,000 ","$121,918,866 ", - ,"The Louisiana Department of Transportation will receive $45,000,000 for the Belle Chasse Bridge and Tunnel Replacement project which replaces a 60+-year-old reinforced-concrete tunnel and the adjacent structural steel vertical-lift-span bridge crossing the Gulf Intracoastal Waterway."
I-395/Route 9 Connector,Maine Department of Transportation,ME: Maine,44.7767302,-68.7321678,4412,Large,Rural,"$25,000,000 ","$78,944,931 ", - ,"The Maine Department of Transportation will be awarded $25,000,000 to create an approximately 6-mile, direct connection between Route 9 and I-395 east of Bangor. The project will create a bypass of the existing route, which has a posted speed limit of 25 miles per hour and several signalized intersections, to connect with I-395 at its terminus at US-1A."
Mound Road Industrial Corridor Technology and Innovation Project,"Macomb County, Michigan",MI: Michigan,42.5665296,-83.0683519,48310,Large,Urban,"$97,864,465 ","$216,860,000 ", - ,The project will reconstruct Mound Road in Macomb County.
I-95/U.S. 70 Innovative Technology and Rural Mobility Corridor Improvements,North Carolina Department of Transportation,NC: North Carolina,35.6531967,-78.133638,27542,Large,Rural,"$147,264,000 ","$879,755,000 ", - ,"The North Carolina Department of Transportation will be awarded $141,900,000 for a network of projects including improvements to U.S. 70 (future I-42) and improvements to I-95."
I-44 Corridor Improvements,Oklahoma Department of Transportation,OK: Oklahoma,36.0993914,-96.0573302,74107,Large,Urban,"$45,000,000 ","$107,774,810 ", - ,"The Oklahoma Department of Transportation will be awarded $45,000,000 to replace multiple bridges, including the bridges on I-44 over 33rd W. Avenue, at Union Avenue over I-44, and on US-75 over I-44."
I-80 and I-99 Interstate Connection,Pennsylvania Department of Transportation,PA: Pennsylvania,40.9240628,-77.7223162,16823,Large,Rural,"$35,110,410 ","$183,395,232 ", - ,"The Pennsylvania Department of Transportation will receive $35,110,410 to provide a direct connection between I-80 and I-99 in Centre County, replacing the current indirect connection along State Route (SR) 26."
Packer Avenue Marine Terminal Capacity & Warehouse Relocation Project,Philadelphia Regional Port Authority,PA: Pennsylvania,39.9863531,-75.1019942,19134,Large,Urban,"$25,500,000 ","$110,500,000 ","$25,500,000 ","The Philadelphia Regional Port Authority will receive $25,500,000 to complete the second phase of a multi-phase improvement plan at the Packer Avenue Marine Terminal. The plan will modernize the Terminal, ensuring that it has sufficient berthing, crane, and terminal capacity to meet expected market demand."
US-78 /SR 4/Lamar Avenue Corridor Improvements,Tennessee Department of Transportation,TN: Tennessee,35.0277847,-89.9346659,38118,Large,Urban,"$71,196,998 ","$258,004,207 ", - ,"The Tennessee Department of Transportation will be awarded $71,196,998 to repair and expand capacity along approximately 4.5 miles of Lamar Avenue in Memphis, from Getwell Road to the Mississippi state line."
"I-35 North Tarrant Express ""Accelerated Elements"" Project",Texas Department of Transportation,TX: Texas,32.8549165,-97.2976617,76137,Large,Urban,"$65,000,000 ","$827,900,000 ", - ,"The Texas Department of Transportation will receive $65,000,000 to accelerate additional transportation elements to the North Tarrant Express (NTE) public-private-partnership, including: the construction of multiple U-turn bridges located in Segment 3C; the I-35W/I-820 Interchange frontage road located in Segment 3B; and improvements to the Mark IV Parkway in Segment 3B."
Northwest Quadrant Freight Mobility Project (5600 West and SLGW Rail Interchange Components),Utah Department of Transportation,UT: Utah,40.7434064,-111.9880199,84104,Large,Urban,"$25,000,000 ","$111,675,487 ","$13,647,228 ","The Utah Department of Transportation will receive $25,000,000 toward a project to improve freight mobility in the Northwest Quadrant of Salt Lake City."
94 North-South Freeway Project,Wisconsin Department of Transportation,WI: Wisconsin,42.6989835,-87.9432837,53177,Large,Rural,"$160,000,000 ","$492,500,000 ", - ,"The Wisconsin Department of Transportation will receive $160,000,000 to reconstruct and expand I-94 in southeast Wisconsin and correct obsolete designs on the current facility."
2nd Avenue Connectivity Corridor Project,The University of Alabama,AL: Alabama,33.1690726,-87.6383797,35401,Small,Rural,"$6,025,657 ","$16,737,936 ", - ,"The University of Alabama will receive $6,025,657 to construct the 2nd Avenue Connectivity Corridor Project to build a bridge over an existing rail line."
PortMiami Truck Gate Innovation,Miami-Dade County,FL: Florida,25.7700009,-80.1679758,33132,Small,Urban,"$7,000,000 ","$15,000,000 ","$7,000,000 ","Miami-Dade County will receive $7,000,000 to replace two outdated cargo terminal gates at the Port of Miami with expanded and automated truck gates."
Heartland Expressway Junction L62A / US 385 to Alliance,State of Nebraska Department of Transportation,NE: Nebraska,41.813568,-103.3125299,69334,Small,Rural,"$18,263,743 ","$34,000,000 ", - ,"The Nebraska Department of Transportation will receive $18,263,000 to convert an approximately 14.6-mile segment of US 385 from the existing two-lane highway into a four-lane divided highway."
Ohio River Rail Improvement Project,Ohio Rail Development Commission,OH: Ohio,39.9516504,-80.7768613,43947,Small,Rural,"$16,250,600 ","$31,882,843 ","$16,250,600 ","The Ohio Rail Development Commission will receive $16,250,600 to improve approximately 30 miles of rail line along the banks of the Ohio River in Jefferson and Belmont County, Ohio."
Veterans Parkway,South Dakota Department of Transportation,SD: South Dakota,43.6032799,-96.7172907,57104,Small,Rural,"$21,000,000 ","$52,776,625 ", - ,"The South Dakota Department of Transportation will receive $21,000,000 to reconstruct the interchange of Interstate 90 with Veteran’s Parkway."
Rock Springs I-80 Interchange and Interchange Road,Wyoming Department of Transportation,WY: Wyoming,41.3615496,-108.902683,82901,Small,Rural,"$14,000,000 ","$28,446,455 ", - ,"The Wyoming Department of Transportation will be awarded $14,000,000 to construct a new diamond interchange at I-80, reconstruct part of Interchange Road, replace an existing bridge over I-80, construct ramps with continuous acceleration/deceleration lanes, and build a new grade-separated crossing over a rail line."
